Program controls for capital owners

Make fake progress impossible.

ProgramWarden is the control layer owner teams run above their contractors' tools. A gate doesn't open without evidence. An overdue promise climbs to a named person. A site clash shows up weeks before the crews do.

14 days of the full product · No card · Your first gate set up in an afternoon

app.programwarden.com/dashboard

Late gates

3

1 on hold 293 days

Overdue actions

14

3 escalated to directors

Site clashes

1

starts in 41 days

40

STN-010 · Gate 3

Final Design Approval

Claimed ready · 3 required missing

Accountability, by named owner

Utility conflict matrix: resubmit

D. Okafor · Meridian · 38d overdue

L3

60% register: structural responses

T. Nguyen · 16d overdue

L2

Class 3 estimate reconciliation

M. Osei · due Fri

on time

Said in every program office, every month

“The report said 85% complete. It said 85% last month.”
Progress is whatever the delivery team types in.
“The gate review is Thursday. The geotech report is ‘coming.’”
The gate will pass anyway, with a condition nobody tracks.
“We found out about the clash when both crews showed up.”
Each contractor's plan assumed it had the ground.

You are not short of information. You are short of a point where it has to be dealt with before the work moves on. That point is what ProgramWarden adds.

Evidence gates

No evidence, no gate.

Each gate carries the evidence it needs: basis of design, independent estimate, utility conflict assessment, funding letter. Readiness is computed from what is actually in hand. A Go is refused while required items are missing, and the decision is logged under the approver's name and cannot be edited afterwards.

  • A team that marks a gate ready with items missing is shown as exactly that
  • A project reporting a phase its gates don't support is flagged by name
  • A gate on hold for nine months is counted as nine months late

Try the gate on the right. Tick the evidence and watch what the approve button does.

Try it — Gate 2

Preliminary Design Approval

30%ready

No evidence, no gate. That's the whole product.

Design Review Studio — live markup

v3 · 60% plot set
BC18 000STA-014 · PLATFORM SECTIONDWG S-201 · REV C · 60% SUBMISSIONConfirm pile cap reinforcementat grid C-4 — see calc pkg 7.2S. Chen → Marlow Eng. · due Jul 24OPENREVISE & RESUBMITPROGRAMWARDEN REVIEW SESSIONGATE 3 EVIDENCE

42

markups placed

6

still open

100%

tracked to closure

Design review

Every comment has an owner, a date and a consequence.

Mark up PDF drawing sets in the browser with clouds, callouts, stamps and calibrated measurements. Run time-boxed review sessions, compare revisions as an overlay, and carry unresolved markups onto the next revision so nothing is quietly dropped between 60% and 90%.

  • Late responses escalate on the same schedule as every other commitment
  • Unresolved comments follow the drawing to its next revision
  • Publishing a reviewed drawing fulfils the gate evidence that depends on it

Shared-site coordination

See the clash before the site does.

On a live station or a shared corridor, the failures are collisions in space and time: two contractors staging on one laydown area, a utility outage across another project's crane pick. Draw each project's ground with its dates. Overlaps between projects are computed, counted down in days, and stay open until a named person records how it was resolved.

  • Clashes are computed from the zones, never typed in as a status
  • Each one shows how many days until the overlap begins
  • Moving either zone later re-opens the clash automatically

Station Alpha — one site, three packages

PKG-2 · Laydown APKG-5 · Crane pickPKG-1 · Access⚠ CLASH — same ground, same weeks

Zones carry date windows. Scrub the weeks — watch what happens when two packages want the same ground.

Where it sits

Above your contractors' tools, not instead of them.

Your delivery teams keep Primavera, Procore and their own document systems. Those tools hold what the contractor says is happening. ProgramWarden is where the owner decides whether to believe it, and where that decision is kept.

Program directors

One screen of what is not as reported: late gates, claimed-ready gates, work ahead of approval.

Controls managers

Readiness and overdue items computed for you, with the export and the gate pack one click away.

Project managers

A gate checklist you can prepare against, and a record that you raised it.

Owner's representatives

The same discipline on every client program, and a client-ready audit trail.

Start with one gate

You don't roll this out. You point it at the next gate you're worried about.

1

This afternoon

Add the project and its next gate. It comes with the standard evidence list for that stage. Edit it to match your governance manual.

2

This week

Tick what is actually in hand. Log the open actions and review comments with a named owner and a date each.

3

At the gate meeting

Bring the readiness number and the one-click gate pack. Record the decision. From then on, anything overdue escalates itself.

The rest of the control loop

Escalation that runs itself

At 7, 14 and 30 days overdue an item climbs: owner, then controls, then directors. It runs every morning without anyone deciding to chase.

Minutes that stay issued

Agenda, attendance and actions with owners. Once issued, minutes lock. Corrections go in the next meeting, the way the contract expects.

An audit trail of the governance itself

Who changed a target date, a forecast, an evidence requirement, and what it was before. Visible to directors only.

The gate pack

One PDF: readiness breakdown, evidence checklist, open critical comments, budget checkpoint, decision and signature block.

Documents with a status that means something

Work in progress, shared, published, archived, following ISO 19650 practice, with numbered transmittals when a document is issued.

Seven roles, enforced

From program director to external consultant, checked on every request. External parties see only the projects assigned to them.

Priced per program office

Every plan starts with 14 days of the full Professional product. No card. Pick a plan once you've seen it work on your own program.

MonthlyAnnual2 months free

Starter

$199/mo

billed monthly, cancel anytime

  • 1 program, 10 projects
  • 5 team seats, external collaborators free
  • Evidence gates and computed readiness
  • Review tracker and locked meeting minutes
  • Automatic escalation to named people

One program office proving the method on its first program.

Start free trial
Most teams start here

Professional

$599/mo

billed monthly, cancel anytime

  • 5 programs, 50 projects
  • 25 team seats, external collaborators free
  • Design Review Studio: markup, sessions, compare
  • Site phasing with clash detection
  • PDF gate packs and CSV exports
  • Everything in Starter

Costs less per month than one day of a claims consultant.

Start free trial

Enterprise

from$1,500/mo

annual agreement, invoiced

  • Unlimited programs, projects and seats
  • Onboarding with your governance manual
  • Security questionnaire and procurement support
  • Annual agreement, invoiced
  • A named contact, not a ticket queue
  • Roadmap input: SSO and integrations are built to order

For agencies that buy through procurement. We answer security questionnaires ourselves.

Talk to the founder

Prices in USD · Extra seats $25 per seat per month · Evidence gates and escalation in every plan

Questions owners ask first

Does it replace Primavera, Procore or Microsoft Project?

No. Your delivery teams keep their scheduling and construction tools. This is the layer the owner runs above them: gates that need evidence, review comments tracked to closure, and overdue commitments that climb to a named person. Those tools record what the contractor says. This records whether you have reason to believe it.

How long before it's useful?

An afternoon. Create a program and a project, add a gate, and it arrives with the standard evidence checklist for that stage, which you can edit. The first time you tick what you actually have in hand, you get a readiness number you can defend. Most teams start with one live gate, not a rollout.

We already have a governance manual. Why software?

Because the manual can't say no. A written process works when the right person is in the room and willing to hold the line. Here the gate itself refuses a Go while required evidence is missing, and an overdue item escalates whether or not anyone is comfortable raising it.

Can it replace Bluebeam for design review?

For owner-side review of PDF drawing sets, largely yes: clouds, callouts, stamps, calibrated measurements, version compare and structured review sessions, in the browser. Every markup is a tracked record with an owner and a date. It is not a CAD editor or an estimating tool.

Can consultants and contractors be given limited access?

Yes. There are seven roles, enforced on the server on every request. External delivery leads and consultants see only the projects a director assigns them, and can respond to comments and actions without being able to touch gates, budgets or decisions.

How is our data protected, and where is it held?

Each organization's data is isolated and every request is checked against the signed-in person's role. Gate decisions and issued minutes cannot be edited, and a director-only audit log records who changed what. Data is hosted in the United States today. SOC 2 is on our roadmap and not yet held; if you need Canadian data residency or a security questionnaire answered, tell us before you start.

Is there a contract?

Monthly plans cancel anytime. Every plan starts with 14 days of the full Professional product with no card. If the trial ends and you haven't picked a plan, your data stays readable and nothing is deleted.

Find out what your status reports aren't telling you.

Set up one program, one gate and its evidence in an afternoon. Fourteen days of the full product, no card.

The walkthrough is with the founder, an owner-side program manager. No sales deck.